EasyManua.ls Logo

Rotex A1 BG Inline - 5 Inspection and Maintenance; Generalities about Inspection und Maintenance; Inspection and Maintenance Tasks

Rotex A1 BG Inline
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 x Inspection and maintenance
22
BA ROTEX A1 BG Inline - 10/2007
5 Inspection and maintenance
5.1 Generalities about inspection und maintenance
Regular inspection and maintenance of the heating system reduces energy consumption and ensures a long life and smooth
operation.
Tests during the annual inspection:
General condition of the heating system, visual inspection of connections and conduits.
Condensate drain, flue gas temperature and flue gas temperature sensors.
Burner operation and burner settings.
Maintenance work to be carried out annually:
Cleaning of the burner components, the combustion chamber and the heating surfaces.
Cleaning of the storage container and the silencer hood.
Replacement of the wearing parts (if required).
ROTEX recommends that you make an inspection and maintenance contract to ensure regular inspection and maintenance.
Have the inspection and maintenance confirmed in the Maintenance log. The Maintenance log is included in the scope of
supply.
5.2 Inspection and maintenance tasks
WARNING!
Improperly executed inspection and maintenance activities can endanger human life and health and have an
adverse effect on the functioning of the gas condensing boiler.
Activities, especially on gas and flue-gas conducting components as well as on the electrical system, must
be carried out only by heating experts authorised and trained by the gas or energy supply company.
Have the inspection and maintenance carried out by authorised and trained heating engineers once a year and, if
possible, before the heating period. This will avoid malfunctions during the heating period.
WARNING!
Live parts can cause an electric shock on contact and cause life-threatening burns and injuries.
Before beginning maintenance work, disconnect the gas condensing boiler from the power supply (switch
of fuse, main switch) and secure against unintentional restart.
WARNING!
Danger of burning on hot surfaces.
Let the burner cool down for a reasonably long time before maintenance and inspection work.
Wear protective gloves.

Related product manuals