6
Standard operation procedures
6.1 - Check before starting up after inactive period
Normally, the RPI is running continuously but in case of starting up the instrument again:
check status of the
concentrated reagents and RPI-Check
check if action is required for the WPU (see AFS display)
check water supply
check General and lab settings (by the Lab Manager)
check if End filter connections are correct (by the Lab Technician)
During startup the instrument is automatically checked and if all start conditions are met, the instrument is
ready for production. If not, this will be indicated with a "is waiting for" message.
6.2 - Normal operation
Do not move the instrument during production (safety and quality reasons)
After login and checking the instrument:
Select "Manual" tab:
Standard operation procedures
MRN-184-EN Version 6 (05-01-2022)