Initial calibration procedure
1. C heck belt scale system mechanical installation meets belts scale manual and installation
drawing.
2. R eview installation parameters.
3. Apply systerm power and start belt conveyor. A llow 30 minutes of continous power to be
applied to the electronics and allow the same amount of time for the running of the belt
conveyor prior to calibration.
4. C omplete all the steps in section 3.2
5. Press RUN to resume scale
’
s
normal operation.
6. N ext, performe a routine calibration procedure.
Routine calibration procedure
1. Review the following scrolls for correct data entry:
a. scale data (Main menu 3)
b. CALIB
DATA
(CAL
DATA
SETUP 1)
c . CALIB
DATA
(CAL
DATA
SETUP 2)
2. Go to CAL
DATA
SETUP 1 and select the calibration mode:
3. W ith the belt conveyor running empty, perform a zero calibration procedure.
4. A fter completing the AUTO zero procedure, perform a span calibration procedure.
5. Repeat the zero and span calibration procedures as necessary to insure calibration
accuracy.
6. R ecord the zero and span on the calibration report permanent record.
7. Press RUN to resume normal operation.
3.2.2.4
3.2.2.4
3.2.2.4
3.2.2.4 Calibration
Calibration
Calibration
Calibration report
report
report
report
Calibration report-data record Conveyor
Date
Test people
Scale capacity
Belt length
Test length
T est time
C alibration
Constant
R-Cal.
Static test weight
Test chain
Cal. mode
Zero-initial cal.
value
— reserve value
Span — initial cal.
value