EasyManua.ls Logo

Sainlogic WS0835 - Sensors Pre-Installation; Test the Sensors Before Installation; Site Survey Before Installation

Sainlogic WS0835
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 15 -
10’ (1.5 to 3 meters) apart).The sensors should be within F
/2°C (the accuracy is ± 2°F/1°C). Allow about 30 minutes for
both sensors to stabilize.
4. Verify proper operation of in/outdoor humidity. Verify
the indoor and outdoor humidity match closely with the console
and sensor array in the same location (about 5 to 10’ (1.5 to 3
meters) apart).The sensors should be within 10% (the
accuracy is ± 5%). Allow about 30 minutes for both sensors to
stabilize.
4. Sensors Pre-installation
4.1 Test the Sensors Before Installation
Recommend to operate and test the weather station for one
week before installing it in the permanent location. In this
period, you can check out all of the functions, ensure proper
operation, and familiarize with the professional weather station
and calibration procedures. This will also allow you to test the
wireless range of the weather station.
4.2 Site Survey Before Installation
Do a site survey before installing the weather station. Take the
following points into Consider:
1. You must clean the rain gauge once per year and change
the batteries every two years. Provide easy access to the
weather station.
2. Avoid radiant heat transfer from buildings and structures.
In general, install the sensor array at least 5ft (1.5m) from any
building, structure, ground, or roof top.

Related product manuals