3 Operation
3.1 Start-up
NOTICE
Open the restriction (1.2) used to adjust the
flow rate before starting up the regulator.
Fill the plant slowly.
CAUTION!
When pressure-testing the pipelines with the
regulator installed, the test pressure must not
exceed 1.5 times the nominal pressure.
EB 3132-2 EN 7
Operation
1
2
3
4
5
6
7
8
9
10
11
0.01 0.02 0.03 0.05 0.1 0.2 0.3 0.5 1 2 3 4 5 6 78 910 15
0.4K
VS
1 2.5
V
m
3
/h
DN 15
DN20,
K
VS
6.3
DN25,
K
VS
8
DN32,
K
VS
12.5
DN40,
K
VS
16/20
3)
DN50,
K
VS
20/25
3)
4
Nominal size
DN 15 20 25 32 40
2)
50
2)
K
VS
coefficient
0.4
1)
1
1)
2.5 4
1)
6.3 8 12.5 16/20
3)
20/25
3)
Flow rate set
point range
m³/h
0.01
to 0.2
0.02
to 0.64
0.02
to 1.2
0.1
to 2.5
0.1
to 3.6
0.1 to 5
0.3
to 10
0.4
to 12.5
0.4
to 15
1)
Special versions
2)
Also as version with flanged body
3)
K
VS
with flanged body
Fig. 3 · Flow rate diagram
Turns of the
set point screw