EB 8546 EN 23
Maintenance
6 Maintenance
Risk of injury due to high pressure.
Shut off the air line before performing work
on the supply pressure regulator.
Draincondensedwaterthathascollected:
Î Activate the manual drainage.
Î Replace the gasket (order no. 0439-
0061), if necessary.
We recommend to check the lter as often as
possible.
WARNING
!
Tip