EasyManua.ls Logo

Sanyo SAP-KM97GHS5A - Defrosting Operation Logic

Sanyo SAP-KM97GHS5A
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10-6. Defrosting Operation (Heating)
Defrosting Flowchart.
26
* Split System A:
(= Cooling cycle)
Split System A (or B)
Heating operation
Defrosting starts.
Defrosting
Cold draft prevention
Defrosting stops.
Split System B (or A)
Temperature in outdoor
heat exchanger
coil drops 1 deg/6 min.
or more and repeats
3 times continuously.
Heating operation
20 minutes masking
6 minutes masking
Temperature in outdoor
heat exchanger coil falls
to –14°C or lower.
Preparation for defrosting
Temperature in outdoor
heat exchanger coil is
26°C or higher.
Defrosting starts.
Cold draft prevention
Defrosting time is over
13.5 minutes.
Indoor unit A
Compressor A
Solenoid coil A
* Split System B: Indoor unit B
Compressor B
Solenoid coil B
Defrosting
Defrosting stops.
**

Table of Contents

Related product manuals