EasyManua.ls Logo

Sapling NTP 8000 Series - Installing a Master Clock

Sapling NTP 8000 Series
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
43
6
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Installing a Master Clock - Wall Mount
3) Insert the wall anchors into the holes.
2) Use a drill to drill holes into the wall at the
marked locations.
4) Insert the sheet metal screws into the top two
wall anchors.
1
1) Use a ruler, a level, and the provided template to
mark four points on the wall.
16 and 3/8in (41.6cm)
6 and 7/8in
(17.5cm)

Related product manuals