4 Operating Instructions Microsart
®
Manifold
4.1.5 Microsart
®
Manifolds for 500 ml
Stainless-steel Funnel ............18
4.2 Selecting an Installation Site .............19
4.3 Unpacking.............................20
4.4 Installing the Product ...................20
5 Getting Started............................21
5.1 Integration of the Microsart
®
Manifold
in the Process Structure .................21
6 Operation .................................22
6.1 Preparing the Process ...................22
6.1.1 Preparing the Base Support
(When Using Microsart
®
@filters) ..22
6.1.2 Preparing the Base Support
(When Using Biosart
®
100) ........22
6.1.3 Preparing the Base Support
(When Using Stainless-Steel
Funnels, the Microsart
®
Funnel
and Biosart
®
250) ................23
6.2 Starting the Process.....................23
6.3 Finishing the Process ....................24
6.4 Repositioning the Process Structure .......24
6.4.1 Fitting the Cover Cap.............24
6.4.2 Removing the Cover Cap ..........25
6.4.3 Attaching the Hose and
Hose Coupling...................25
6.4.4 Removing the Hose ..............25
6.4.5 Connecting Two Manifolds ........26
6.4.6 Disconnecting Two Manifolds......26
6.4.7 Removing the Base Support .......27
6.4.8 Attaching the Base Support .......27
7 Cleaning and Maintenance..................28
7.1 Cleaning Product Surfaces ...............28
7.2 Maintenance Schedule ..................28
7.3 Cleaning the Manifold...................29
7.3.1 Cleaning after each Filtration: .....29
7.3.2 Cleaning at the End of the
Work Day.......................29
Manual_Microsart_Manifold_W166001-e.indb 4 28.02.19 10:03