EasyManua.ls Logo

Sartorius WM Series - Motor Cable; Switching on Power;Initial Commissioning

Sartorius WM Series
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Motor Cable
The motor cable is attached to the checkweigher frame at the factory.
This must not be modified.
§ Check whether the motor cable is unobstructed and not in contact with any objects (e.g.,
the load plate on the checkweigher).
§ Check whether the plug on the motor cable is firmly connected and the closing clamp for
the connection is in the “up” position.
Switching on Power/Initial Commissioning
Before initial commissioning:
§ Check whether the local supply voltage matches the rating listed on the manufacturer’s
ID label.
§ Connect the equipment to power.
§ Check the supply voltage, phase, neutral connector and ground connection. Check the
protective earth (grounding) in accordance with national regulations.
§ Remove all objects from the conveyor belt before turning on the equipment.
§ Turn the main switch to the “1” or “ON” position. The checkweigher performs a self-test.
Wait until “0” is displayed on the weight readout.
§ Turn the “ON/OFF” switch to the “ON” position. The conveyor belt turns.
12

Related product manuals