5.2 Commissioning after storage
If the maximum storage time is exceeded, the Sauer-Compressor must be
inspected for possible damage before commissioning.
NOTICE!
Damage to the Sauer-Compressor
The following work should be carried out independently with
the authorisation of Sauer USA.
Otherwise, contact the Sauer-Service department.
Personnel:
n
Service personnel
Protective equipment:
n
Hearing protection
n
Work clothing
n
Protective gloves
n
Safety boots
Requirement: The Sauer-Compressor has been properly preserved and
stored.
1. Connect the power supply
.
2.
Fill the compressor with a specified oil.ÄOil recommendation
3. Perform commissioning according to the operating instructions.
4. Watch out for abnormal operating noise.
5. Compare the values displayed on the pressure gauges for each com-
pression stage with the specified setpoints in the technical data: Ä
Operating Instructions
PRESERVATION