1.9.1 Performance Level
The PL of the entire system is calculated as follows:
PL
Low
= c
N
Low
= 1
Result according to Table 1-1 : PL = c
1.9.2 SIL with high demand rate
The SIL of the entire system is calculated as follows:
PFH = PFH
sensor
+ PFH
PROTECT-PSC
+ PFH
actuator
= 5.2 * 10
-6
/h + 1.5 *10
-8
/h
+ 2.6 * 10
-8
/h
= 5.2 * 10
-6
/h
Result according to Table 1-4 : SIL = 1
1.9.3 SIL with low demand rate
The SIL of the entire system is calculated as follows:
PFD = PFD
sensor
+ PFD
PROTECT-PSC
+ PFD
actuator
= 4.1 * 10
-3
+ 3.0 * 10
-4
+ 1.9 * 10
-4
= 4.6 * 10
-3
Result according to Table 1-3 : SIL = 2