EasyManua.ls Logo

Seagull Models DHC-1 Chipmunk - Engine Mount Installation

Seagull Models DHC-1 Chipmunk
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
ENGINE MOUNT INSTALLATION.
1) Locate the items necessary to install
the engine mount included with your
model.
2) Use four 4x30mm head bolts and four
4mm washers to attach the engine mount
rails to the ewall. Tighten the screws .
Make sure to use threadlock on the screws
to help prevent them from vibrating loose.
8) Use balsa block to hold in place the fuel
tank with C/A glue to secure the fuel tank
inside the fuselage
9) Connect the lines from the tank to the
engine and mu.  vent line will con-
nectto the mu and the line from the
clunk tothe carburetor.
Fuel pick up tube. Fuel ll tube.
Ven tube.

Related product manuals