EasyManua.ls Logo

Seakeeper 9 - Home Screen Button Functions

Seakeeper 9
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
MANUAL
Product:
Document #:
Rev:
Page:
SEAKEEPER 9 / 7HD
90222
6
11 of 20
1.5.3 Installation of Seakeeper
1) Locate and position 4 isolation gaskets
onto foundation beams (for metal to
metal contacts only). NOTE: Sealant or
caulk is recommended to be applied.
Apply a small bead (approximately 4 mm
wide) of sealant (silicone or caulk)
between both mating surfaces of each
isolation gasket where it contacts the
beam and the Seakeeper. This will
prevent water from wicking between the
parts and setting up corrosion. Check
isolation gasket alignment by test fitting
bolts without any obstructions.
2) Lower Seakeeper into position onto the
hull foundation beams and align over
drilled holes.
3) Install Seakeeper supplied M14
fasteners Or Grade 8.8, M14-2.0 bolts to
maintain a minimum thread engagement
of .68 in (17.3 mm) apply a moderate
coat of removable thread locker to the
threads of each bolt and include a small
bead of sealant under each washer
before installation.
4) Torque all fasteners to 100 ft-lbs (136 N-
m).
5) Proceed to electrical and cooling portion
of the installation.

Table of Contents

Other manuals for Seakeeper 9

Related product manuals