13
L
R
R
R
R
R
R
R
2.7 Precautions
Before starting the winch operation, always make sure that no unauthorized
personnel are in the danger zone indicated in the diagram below.
Safety
Danger zone
Distance (R)
Attachment point
Rope length (L)
SEPSON cannot exclude the risk of danger outside the above zone in the event of
material breakdown.
Length L: paid-out rope Distance R
Smaller than 3 m not permissible –
3 m to 5 m 2.0 x L
6 m to 30 m 1.5 x L
30 m to max. possible distance 1.1 x L