www.servware.com
800•768•5953
Service, Installation & Care Manual
10"
(254 mm)
11
02. EQUIPMENT INSTALLATION
2.5 Gas Leak Check
2.6 Positioning
Before lighting the equipment and putting it into operation, check all gaskets on the
gas supply line for leaks. For this, do not use any type of wrench to check for leaks, use a
sudsy soap and water solution.
Follow the steps below for the correct procedure to power on:
1. Turn on the manual gas valve on the inlet side of the gas supply line.
2. Check for gas leaks at the exible coupling or gas connector connection using
a soap solution.
3. In moderation, spray or scrub the solution with soap on gas connections - active
bubbling indicates the location of the gas leak.
4. If a gas leak is detected, turn off the manual gas valve at the inlet side of the gas line.
Call your certied and licensed service technician.
5. If the equipment has no gas leak, continue with the equipment operating instruction.
• I Installation must be on a at and level surface.
• Install the equipment under hoods or exhausts.
• There must be a distance of at least 10" (254 mm) at the rear, 6" (152.4 mm) at the
right and left of the equipment from combustible surfaces as shown in the gure
below.