Do you have a question about the Shimadzu DGU-405 CL and is the answer not in the manual?
Brand | Shimadzu |
---|---|
Model | DGU-405 CL |
Category | Laboratory Equipment |
Language | English |
Lists related manuals and their descriptions provided with the product.
Explains warnings, cautions, notes, and symbols used throughout the document.
Details the product's compliance with EN55011 standards for electromagnetic disturbance.
Describes the system's purpose for qualitative and quantitative analysis in diagnostic applications.
Outlines the process for generating a calibration curve using non-zero standards.
Explains implementing quality control using control samples and checking assessment results.
Describes the instrument as a degassing unit and its operation principle.
Illustrates the operational flow and components of the degassing unit.
Explains how dissolved gas permeates through the membrane and is discharged.
Lists standard parts included with the instrument and their part numbers.
Details the LINK-CHAMBER KIT for serial connection of channels and its components.
Identifies and describes front panel components like Control LED and Error LED.
Explains fluid inlets/outlets, noting independent channels.
Details functions of Leakage port, Exhaust port, Drain tube, and Right Panel.
Identifies and describes back panel terminals and connectors.
Provides instructions and cautions for introducing liquid and starting solvent delivery.
Lists solvents that must not be introduced into the instrument to prevent damage.
Warns against feeding pressurized liquid to the instrument to prevent damage.
Details the initial steps and LED indications for starting the degassing unit operation.
Covers preparing mobile phase, connecting tubing, and drawing liquid with a syringe.
Refers to the System Guide for replacing mobile phase, including buffer solutions and incompatible phases.
Provides instructions on how to stop the degassing unit operation, including solvent replacement precautions.
Compares decompression degassing with membrane vs. Helium degassing methods.
Emphasizes the need for periodic inspections for safe operation and service contracts.
Instructs to turn off power and unplug cable before maintenance to prevent hazards.
Advises against removing the main cover without contacting Shimadzu service.
Stresses using specified component parts for replacement to avoid injury or malfunction.
Details preparatory steps like replacing mobile phase with water and wiping the exterior.
Provides a schedule and items for periodic inspection and maintenance of the unit.
Provides step-by-step instructions for removing and installing the right panel of the instrument.
Details tasks for long-term non-use, including washing interior and drying the unit.
Provides instructions for cleaning the instrument's exterior using mild detergent and water.
Outlines the procedure for decontamination cleaning after handling hazardous substances.
Details performance specifications like channels, degassing performance, and maximum flow rate.
Lists other technical specifications including materials, operating conditions, dimensions, and power supply.
Explains the wiring method for the external output terminal (ALARM terminal).
Details how to connect external equipment, including alarm terminals and controller connections.
Describes how to perform serial connection of channels for higher degassing levels and the required kit.