EasyManuals Logo

Shimadzu GCMS-QP2020 User Manual

Shimadzu GCMS-QP2020
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
Safety Precautions
vi
Precautions for Maintenance, Inspections, and Adjustments
! WARNING
Stop the supply of hydrogen gas in the following situations.
When the GCMS-QP2010 Series, GCMS-QP2020, and GCMS-TQ
Series are shut down
When there is a vacuum leak
When there is a power outage
Failure to do this can cause serious accidents, such as fires or explosions.
^ "Accumulation of Hydrogen Gas Inside the MS" P.xi
Be sure that hydrogen gas leak check equipment is always at
hand, and regularly perform leak checks for the carrier gas line.
Set up hydrogen gas alarm devices around the room where the equipment will
be installed for improved safety.
Check for rises in the concentration of hydrogen using a portable hydrogen
detector.
Manage calibration of the hydrogen gas alarm device
according to the manufacturer’s instructions.
When the tubing connections and hydrogen gas supply
connections are reconnected, perform a leak check.
Failure to do this can cause serious accidents, such as fires or explosions.
Stop the supply of hydrogen gas when the instrument is not
being operated.
Failure to do this can cause serious accidents, such as fires or explosions.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Shimadzu GCMS-QP2020 and is the answer not in the manual?

Shimadzu GCMS-QP2020 Specifications

General IconGeneral
BrandShimadzu
ModelGCMS-QP2020
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals