EasyManua.ls Logo

Shini SHD-E - Installation and Debugging; Direct Installation

Shini SHD-E
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17(29)
3. Installation and Debugging
Notes for Installation and Positioning
1) Machine just can be mounted in vertical position. Make sure theres no
pipe, fixed structure or other objects above the installing location and
around the machine which may block machines installation, hit objects or
injure human person.
2) In order to maintain convenient operation, its suggested to keep 1m space
around the machine. Please keep at least 2m distance between the device
and the inflammable goods.
3) This series of models only could be applied in working environment with
good ventilation.
3.1 Direct Installation
Picture 31Direct Installation
Direct installation type is to mount the hopper dryer directly on the injection
molding machine via a standard base.
When using the method to mount the dryer, the equipped standard base must
according to material inlet diameter of the molding machine mounting drill holes.
Then use the screw to fasten the base and the molding machine inlet.

Related product manuals