Installation and operating instructions MHS400 smart
05.2017 45
Positions of the calibration and teach-in run
The descriptions of the operating sequences on the following pages are based on the example of a primary sash. The
following positions are approached after starting:
1. Both lift & slide sashes
release and the primary sash opens slightly (moves to the waiting position).
2. The secondary sash opens as far as the end position stop then moves back to the “Close” position.
3. The secondary sash opens again as far as the end position stop, moves back to the “Close” position and locks.
4. The primary sash opens as far as the end position stop again, moves back to the waiting position, stops briefly and
then moves on as far as the “Close” position.
5. The primary sash opens as far as the end position stop again, moves back to the waiting position, stops briefly and
then moves on as far as the “Close” position.
6. Primary sash locked