Covers the process of unloading transport units and assembling the switchpanels.
Details the procedures for connecting HV and LV cables, and earthing the switchpanel.
Explains how to set vacuum contactors, perform trial operation, and conduct power-frequency withstand voltage tests.
Details operations with the HV door closed, focusing on the withdrawable unit movement and vacuum contactor.
Explains the procedure for opening and closing the HV door, including safety precautions and key operations.
Covers operations performed with the HV door open, such as disconnecting LV connectors, removing the withdrawable unit, and replacing fuses.
Covers procedures for emergency door interlock release, mechanical emergency off operation, and replacement of parts.