EasyManua.ls Logo

Siemens 8BK30 - Bolting the Earth Bus Sections Together; Busbar Installation; Connecting the HV Cables; Earthing the Switchpanel

Siemens 8BK30
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.2.6.3 Ҿಇజಇ
၎ତଇሏ๼ڇᇮڦజಇՂႷᆩሏ๼ڇᇮᅃഐ༵ࠃڦև৆
ࠦ૶থ዁జಇ૶থӱDŽ1Lj 11Džฉăথة௬ཱฉᆳኬă
M12 ພᆌ๑ᆩ 70Nm ڦ૰჉৆ܸ M12 அజሶ 40Nmă
2.2.6.4 ߳܎থں၍૶থሞᅃഐ
߲߳ሏ๼ڇᇮڦথں၍܎ۼՂႷ૶থሞᅃഐLjଇ߲Ⴔᄲ૶থ
ڦۼ߲ཀྵăՂح߰ӱڦ
Lj၎ତথں၍ᆩஅພ჉ሞฉ௬ăߴথة௬ཱฉᆳኬă
2.3 ۉഘ૶থ
࠲ࡋాڦߛუۉમᆌᆩ M12 அພࠦۨă
2.3.1 ߛუۉમڦ૶থ
ߛუۉમዕ܋ᇑۉમ๪ాথ၍܋ڦࠦۨ๑ᆩ M12 அພLjా
ዃڦۉમኧᅜۙবă
2.3.2 ࠲ࡋڦথں
዁ณᅃ໼࠲ࡋڦথں܋૶থ዁ۉበڦথںဣཥฉDŽኸڞ
ຕኵǖ5 ໼࠲ࡋLjഄዐ 1 ໼থ዁ۉበڦথںဣཥฉDž
߳থں܋ጱՂႷ૶থ዁ۉમ૶থ๪ڦথںಇฉă
ሞଇ߲ሏ๼ڇᇮ૶থتLjஅພٗፑՉࡋDŽٗࡋമ܋࠵Dž
ح߰ӱLjժՉLjڦ
૰ࠦۨሞᆸՉฉLj๑໲்փ዁ᇀᅍ฿ă
ֱᅙᆩஅພࠦۨࡻڦ࠲ࡋ๟ޏኈኟؽ኱ă
ڇْLjۙLjժҾ
ጎ௬ฉă
2.2.6.2 ࠲ࡋࠦۨሞإฉ
֖ለ཮ 10 ૩Lj࠲ࡋڦڹևࠌᆶෙ߲ 45mm×25mm ֣Lj
ᆩઠ৆ࠦă
ࡰথۅǖ
࠲ࡋሞ 45mm×25mm ֣تڹև઀ᇑإฉڦࡆڢ
ࡰথഐઠăDŽස཮ 2.2.6.1 ব໯ຎDžLjසႴᄲ؊གဤڦࣆLj
ሞ޿تᆩۈೌLjփᆩۉࡰăۉࡰࢫLjሞࡰথتཱฉݞႮഁă
அພ৆ࠦথۅǖ
ཚࡗ 45mm×25mm ֣Lj࠲ࡋۨ࿋ሞإࡆڢฉDŽᇨ
ӱDžժLjإ֣تڹև֭
෇ۈೌLj৆ࠦஅພLjڍփ๑࠲ࡋՎႚă
إڢLjݣߒںӱLj
ᆩ಴ቯஅພࠦۨă
At the joint of the transport units to be bolted together,
pass the fixing bolts through the frame of the left-hand
panel (viewed to operating front) and through the
partition and screw them into the frame of the
right-hand panel. The associated nuts are fixed by
pressure in the support structure of the right-hand
panel so that they cannot be lost.
Check to see whether the bolted panels are truly vertical.
Move up the other transport units one after the other,
align them and bolt the support structures together.
2.2.6.2 Fixing the switchpanels to the foundations
Refer to the examples given in Fig.10. The baseframes of
the double panels have three 45mm×25mm cutouts for
fixing purposes.
Xfmefe!kpjout;
Weld the baseframes of the panels in the 45mm×25mm
cutouts to the foundation rails. Use shims (Section 2.2.6.1)
where necessary to avoid welding across air gaps.
Coat the welds with anti-corrosion paint.
Bolted connections:
Bolt the panels to the foundation rails (false floor) through
the 45mm×25mm cutouts. Insert shims between the
foundation and the baseframe in the cutout section.
Tighten the bolts without distorting the switchpanels. At
locations where no foundation rails can be embedded. The
switchpanels are placed direct onto the reinforced concrete
floor and fixed with dowels.
຿அພ
Screw off the bolts
ጚඓݣዃڦሏ๼ڇᇮ 1
Tranport unit1 , aligned
Ӏཀྵ໯๖ݛၠᅎۯڇ
2 ժۙኝ
Move up transport
unit2 in the arrow
direction and align
ሞُتᆩஅພࠦۨ Screw in the bolts here 9. ࡋᇑࡋᆩஅພ৆ࠦ
Fig.9 Panel bolting
ࡰথ
welded
A-B প௬ section A-B
ᆩஅພ૶থ
bolted down
10 ࠲ࡋ৆ࠦሞإฉ Fig.10 Fixing the switchpanels to the foundations
70
80 18.5
2.2.6.3 Busbar installation
The busbars of adjacent transport units must be connected
to the busbar connectors (1,Fig.11) using the parts andxing
elements supplied with the units. Grease the contact faces.
M12 bolts must be tightened with a torque of 70 Nm and
M12 bolts with a torque of 40 Nm.
2.2.6.4 Bolting the earth bus sections together
The earth bus sections for the individual transport units
must be linked together. One of the two sections to be
bolted together is fitted with a link. This must be undone,
passed through the opening in the partition wall and
bolted to the two adjacent earth bar sections.Grease the
contact faces.
2.3 Electrical connections
Using M12 bolts to fix HV cable inside switchgear.
2.3.1 Connecting the HV cables
The terminal links of the switchpanel are fitted with the
appropriate fixing elements (M12 bolts) for the cable lugs.
The built-in cable support rails are adjustable.
2.3.2 Earthing the switchpanel
Connect the earth terminal of at least one panel to the
station earth (guide value: one terminal for five panels)
The earth terminal must be connected to the earth busbar
in the cable termination compartment.
11
జಇ L1LjL2 L3 ڦ૴থۅ
Fig.11
Connecting point of
busbars L1, L2and L3
1 Connector (link) for the
busbar sections
1 జಇ૶থӱ
17
16
Ҿ
Installation

Table of Contents

Related product manuals