Siemens 8DA - 5.5 Setting Down Transport Units at Installation Place

Siemens 8DA
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
=USNJVOTPKV=G=fkpq^iiqflk=fkpqor`qflkp=Ua^=G=oÉîáëáçå=MP 11
fåëí~ää~íáçå
Shim plates 0.5 to 1 mm
Cleaning agent HAKU 1025/90
Soft, lint-free cloth
Torx reversing ratchet / screwdriver T10/80, T20/100, T25/100, T30/115
Water level
Guide string
Rod magnet with flexible shaft
Open spanners SW 13, 16, 17, 18, 19, 24, 27, 32 , 36
Ring spanners SW 13, 16, 17, 18, 19, 22, 24, 27
Various screwdrivers
Vernier caliper
Water pump pliers
Mirror with flexible shaft (welding mirror)
5.6 Installation and fixing material
Before starting to install the individual components, provide for the required installation
and fixing material.
6 Unloading and erecting the transport units
6.1 Packing and transport unit
Packing The transport units can be packed as follows:
on pallets, covered with PE protection sheeting
in a seaworthy crate (switchgear is sealed with desiccant bags in PE protection sheet-
ing)
other packings in special cases.
Transport unit Transport units consist of:
Individual panels or panel groups consisting of up to 4 individual panels
Accessories
6.2 Checking the delivery for completeness and transport damage
Before installation, the transport units must be checked for completeness and damage.
NOTE!
The packing materials of 8DA switchgear can be disposed of as classified materials. Please observe the local
regulations for disposal and environmental protection.