EasyManua.ls Logo

Siemens 8DA - About these instructions; Scope and Limitations

Siemens 8DA
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
=USNJVOTPKV=G=fkpq^iiqflk=fkpqor`qflkp=Ua^=G=oÉîáëáçå=MP 3
Contents
Safety instructions............................................................................4
1 Signal terms and definitions................................ 4
2 General instructions ............................................ 4
3 Due application.................................................... 4
4 Qualified personnel ............................................. 5
Installation.........................................................................................6
5 Before installation................................................ 6
5.1 Preliminary clarifications...................................... 6
5.2 Switchgear room ................................................. 6
5.3 Installation dimensions and floor fixing ............... 6
5.4 Intermediate storage ........................................... 9
5.5 Tools/auxiliary means .........................................10
5.6 Installation and fixing material............................ 11
6 Unloading and erecting the transport units ........ 11
6.1 Packing and transport unit.................................. 11
6.2 Checking the delivery for completeness and trans-
port damage ....................................................... 11
6.3 Checking the SF6-gas pressure .........................12
6.4 Unloading transport units ...................................14
6.5 Transporting the units to the place of installation
...........................................................................15
6.6 Setting down the transport units at the place of
installation ..........................................................16
6.7 Aligning the switchgear......................................19
7 Assembling the switchgear............................... 20
7.1 Preparing busbar assembly ............................... 21
7.2 Installing the transport unit ............................... 23
7.3 Installing further transport units ........................ 27
7.4 Completing switchgear installation ................... 27
8 Installation work with SF6-gas before commis-
sioning............................................................... 30
8.1 Completing busbar assembly and filling with SF6-
gas..................................................................... 30
8.2 Assembling panel connections supplied sepa-
rately and filling circuit-breaker housings with SF6-
gas .....................................................................34
9 Performing the power-frequency voltage test ....36
10 Installation work with SF6-gas after the power-fre-
quency voltage test............................................38
10.1 Installing solid-insulated bars at the panel connec-
tion, and filling the circuit-breaker housings with
SF6-gas ..............................................................38
11 Removing and installing non-disconnectable bus-
bar voltage transformers .................................... 39
11.1 Removing non-disconnectable busbar voltage
transformers ...................................................... 39
11.2 Installing non-disconnectable busbar voltage
transformers ...................................................... 43
12 Final installation work.........................................46
12.1 Mounting cables with plugs...............................46
12.2 Connecting low-voltage cables ..........................46
12.3 Mounting the metal covers ................................ 46
13 Tests ..................................................................46
13.1 Checking the SF6-gas filling...............................46
13.2 Checking the circuits of the low-voltage equip-
ment ..................................................................47
13.3 Checking high-voltage connections ................... 47
13.4 Checking electrical connections.........................47
13.5 Checking protection against environmental influ-
ences .................................................................47
14 Commissioning ..................................................48
14.1 Checking the installation work ...........................48
14.2 Test operation ....................................................48
14.3 Checking the accessories ..................................49
14.4 Correcting circuit diagrams ................................ 49
14.5 Instructing the operating personnel ................... 49
Index .............................................................................................. 50

Table of Contents

Other manuals for Siemens 8DA

Related product manuals