=USNJVOTPKV=G=fkpq^iiqflk=fkpqor`qflkp=Ua^=G=oÉîáëáçå=MP 15
fåëí~ää~íáçå
! Push the round bars into the transport holes at the front and at the rear.
! Attach ropes or chains at the ends of the round bars.
! Stretch the ropes or chains by lifting the transport tackle carefully.
! If the ropes or chains are touching the transport unit, use transport tackle / expander.
! Lift the transport unit carefully.
6.5 Transporting the units to the place of installation
Preparing the switchgear
room
! Bridge floor openings that have to be crossed and prop up with adjustable supports.
! Fix the bridges to secure them against displacement.
! Clean the switchgear room. Special cleanliness is required.
! Draw a marking line at the place of installation in order to align the switchgear.
! Unpack the transport units inside the switchgear building. Do not unpack parts
supplied with the switchgear in order to avoid loss and damage.
Fig. 7: Position of transport holes
Fig. 8: Marking of transport
holes
DANGER!
Risk of falling down when crossing provisionally bridged floor openings with the
transport units.
! Observe sufficient load-bearing capacity of the bridges.
! Support bridges adequately.
! Secure bridges against displacement.