=USNJVOTPKV=G=fkpq^iiqflk=fkpqor`qflkp=Ua^=G=oÉîáëáçå=MP 25
fåëí~ää~íáçå
! On the observer's command, push the transport unit to be connected towards the
already mounted one using the lifting gear. The observer checks and corrects the
approach of the busbar sections.
! Continue approaching the transport units until the flanges touch evenly at the
insulating plates.
! In case of deviations, correct the position of the transport unit, compensating any
floor unevenness with shims under the corners (same points as for roller pads /
bars).
Fig. 16: Short busbar housing with compensator
a
Busbar housing
s
Compensator
d
Insulating ring (thickness: 18 mm)
f
Insulating ring (thickness: 4 mm)
Fig. 17: Long busbar housing with insulating joint