Loading...
=USNJVOTPKV=G=fkpq^iiqflk=fkpqor`qflkp=Ua^=G=oÉîáëáçå=MP 31
fåëí~ää~íáçå
Preparing the busbar run for filling gas
Fig. 22: Desiccant bags in the gas compartments (position identified in the illustration by black squares; on the switchgear,
with the inscription "Filter" on the outside)
Item no. Designation Desiccant bags
a
Busbar housing, left end panel 2 x 250 g
s
Busbar housing, with post insulator 1 x 450 g
d
Busbar housing, general type with "Filter" inscription on the cover 2 x 250 g
f
Busbar housing, left-hand panel of bus sectionaliser 2 x 250 g
g
Busbar housing, right-hand panel of bus sectionaliser 2 x 250 g
h
Busbar housing, right end panel 2 x 250 g
j
Bus riser housing of bus sectionaliser 2 x 250 g
k
Connection housing of bus sectionaliser 2 x 250 g
l
Circuit-breaker housing, left-hand panel of bus sectionaliser 2 x 250 g
;
Circuit-breaker housing, general type 2 x 250 g
NOTE!
If the circuit-breaker housing
; of a bus sectionaliser is mounted in the right-hand panel, the connection hou-
sing of the bus sectionaliser
l is located in the left-hand panel.