EasyManua.ls Logo

Siemens ADVIA 2400 - Page 40

Siemens ADVIA 2400
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
144 ADVIA 2400 Operator’s Guide
6. Replace and tighten the cap.
7. At the ISE Operation window, select
Execute (STEP-1).
The message "Line Wash 1 Running" and the approximate amount of time remaining
displays. You cannot stop this operation. If you must stop, press the
SYSTEM STOP
button on the analyzer display panel.
This step takes about 17 minutes.
8. When step 1 of the wash completes, replace the dummy electrode with the original
Na, K, Cl, and Ref electrodes.
9. At the ISE Operation window, in the ISE line wash area, select
Execute (STEP-2)
The wash starts and buffer prime is performed 10 times. The message "Line Wash 2
Running" and the approximate amount of time remaining displays.
10. Verify no leaks or bubbles exist and that the buffer is going to the waste during the
priming cycle.
11. At the ISE Operation window, next to the Initialize button, select
Execute.
12. Perform calibration and run controls.

Table of Contents

Other manuals for Siemens ADVIA 2400

Related product manuals