Preparatory work
11
Siemens Building Technologies 007833_a_en_--.doc
Fire & Security Products 03.2004
4 Preparatory work
Information of system owner
Inform the system owner how much work is involved and the time required com-
pleting it. Point out that system operation will be reduced.
In large systems, an out-of-commission report must be filled in and signed by the
system owner.
Blocking of system parts
Blocking of:
Remote alarm (advise monitoring station)
Fire control installations and means of alarm
Time schedule
Time schedule must be determined with the system operator for the following test
sequences:
Alarm tests (incl. remote transmission)
Performance check of fire control installations
Any follow-up training
Any clarification

Other manuals for Siemens FC700A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens FC700A and is the answer not in the manual?

Siemens FC700A Specifications

General IconGeneral
BrandSiemens
ModelFC700A
CategoryFire Alarms
LanguageEnglish

Related product manuals