EasyManuals Logo

Siemens FC922 User Manual

Siemens FC922
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #44 background imageLoading...
Page #44 background image
FS20 Marine Fire Detection Control Panel
44
Siemens Industry, Inc. A6V10519176_enUS_b
Building Technologies Division
9 BP-62 Batteries
The battery bracket is preinstalled in the unit prior to being deliveried.
9.1 Install Batteries – BP-62
NOTICE
Danger of short circuit
Potential damage to hardware
The supplied jumper wire must not be connected until the time of
commissioning.
Ensure the polarity of the supply is correct; red cable = positive pole, blue
cable = negative pole.
The batteries must meet the predefined specifications. For specifications, refer to the
section, ‘
Determine Battery’ on page 47.

Table of Contents

Other manuals for Siemens FC922

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens FC922 and is the answer not in the manual?

Siemens FC922 Specifications

General IconGeneral
BrandSiemens
ModelFC922
CategoryControl Panel
LanguageEnglish

Related product manuals