16.1 Program sequence PME73.820...  
 For connection diagram fuel train (G) 
710 5d 75e/ 1111
M
Z
V1
V2a
AL
K1X2-02 Pin 3
Actuator position
High-fire
Cam V2
Ignition load / low-fire
CLOSE
R
LR-OPEN
LR-CLOSE
LP
Pmin
P LT
ION / QRA
Not active
X3-04 Pin 5
Relay
contact
Function / inputs
Display and operating unit parameter number
LED permanent
LED flashing
tw          t11    t10       t12    t3    t3n      t4                   t8        td4   td1  td3   td2
Standby           Startup          Operation Shutdown    Valve proving
If parameter
                                P241.00 =1 (ON)
Can be 
parameterized
t1        
TSA
259        225    260 226 257      234
Relay
contact
Function / outputs
SK
X3-04 Pin 1
X5-03 Pin 1
X5-03 Pin 3
X65 Pin 1
X5-03 Pin 2
X65 Pin 1
X3-02 Pin 1
X5-01 Pin 2
X2-02 Pin 4
X9-04 Pin 2
K1X6-03 Pin 3
K4X2-01 Pin 3
K5X4-02 Pin 3
K7X7-04 Pin 4
X7-01 Pin 3
K2/1X2-03 Pin 3
21 22  24 22  30  30 36  38  40  42  44  72 74 10  80 81 82 83 oP1 74 
224       
t11
POC
POC
240 240 240 240 240 240 242 243 244 245
t11 t12
SV
V2
K9X7-02 Pin3
SA-KL
K12X2-09 Pin 2
SA-NL
K11X2-09 Pin 3
SA-Z
X2-09 Pin 1
SA-R
X2-09 Pin 4
Input from cam V2
X2-09 Pin 8
Output from cam V2
X2-09 Pin 7 K2/2
*) *) *) *)
Phase number AZL2...
Phase number 7 segment in the LME...
21 22  24 22  30  30 36  38  40  42  44  72 74 10  80 81 82 83 oP:P1 74 
230
Not active
Not active
*)
*1
*2
 
Figure 46: Program sequence PME73.820... for connection diagram fuel train (G) 
*)  During the actuator running phases, the actuator feedback signal must be OFF first, then ON. 
*1  Valve proving, if P241.00 = 1 after mains ON, lockout, P234 (postpurge time t8) P241.01 = 0 second or 
*2  Valve proving, if P241.00 = 1 and P234 (postpurge time t8) >0 second and P241.01 = 1