Service Manual
Installation Instructions
Siemens Ltd. Med Division India Version 4.0
Page 7 of 12
2 Switching the unit ON
Switch ON the MCB
.
If the unit is being installed within six months from the date of despatch then the
forming is not required for the Capacitors. Before Switching ON the Unit open
the top panel cover of MM10 control by removing the ornamental screws (2x)
and remove the ST link (jumper pin) on D915 PCB
Switch the Generator ON by actuating momentarily
The Display and radiation Indicator light up.
The kV and mAs display read
for 3 Sec and then the stable mAs value appear. Once the Capacitor Bank is charged
to a value of 355V DC, then the stable kV value appears and it is indicated by a long
Beep
The unit becomes ready for use after this end of setup
After set-up, initial hardware checks and capacitor bank fully charged to 355V DC the
display changes to
the default kV and mAs settings.
The kV & mAs display and settings will now respond to the corresponding switches on
the panel.
MCB