EasyManua.ls Logo

Siemens SENTRON 3VA1 - Load Acceptance and Load Shedding - Load Management

Siemens SENTRON 3VA1
676 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Description
2.8 Electronic trip unit
3VA molded case circuit breakers with IEC certificate
102 Manual, 03/2019, A5E03603177010-03
Diagnostics display
When a TD500 test device is connected, you can use it to initiate a test. The following
screen appears when a TD500 is connected. The bar flashes at a frequency of 0.5 Hz.
The bar travels from left to right while testing is in progress. The test ends with a trip.
2.8.4
Load acceptance and load shedding - load management
3VA molded case circuit breakers equipped with an ETU 3-series or higher series provide
two current thresholds for the purpose of implementing a local load management function.
Load shedding is the upper threshold, and load acceptance the lower threshold.
Incoming alarm "load shedding"
Parameter load acceptance 100 A
Outgoing alarm "load shedding"
Incoming alarm "load acceptance"
Parameter load shedding 400 A
Outgoing alarm "load acceptance"
Current in one phase
Note
No trip
Tripping is never initiated as a result of the current value crossing the upper or lower
thresholds.

Table of Contents

Related product manuals