EasyManua.ls Logo

Siemens SIMOTICS 1PQ8 - Terminal Box 1 XB1634; Preparation; Checking Winding Connections; Figure 6-5 Terminal Box 1 XB1634

Siemens SIMOTICS 1PQ8
166 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.2.4 Terminal box 1XB1634
Figure 6-5 Terminal box 1XB1634
The connecting cables are introduced into the terminal box 1XB1634 through cable glands
with threaded holes 4 x M80 x 2 and 2 x M25 x 1.5. The cable glands are not included in the
standard scope of supply. The version with onion sealing ring is optional.
For more information, see:
Inserting the cable into the 1XB16... terminal box with cable gland (Page 75)
Inserting the cable into the 1XB.. terminal box with ring seal (Page 77)
Connecting cables with cable lugs (Page 78)
Connection without cable lugs (Page 79)
6.3 Preparation
6.3.1 Checking winding connections
With an open winding design, i.e. when the windings start and end directly at the terminal box
(see the "Terminal marking" (Page 72) section), the connections are made using jumpers in
the terminal box. The jumpers for the open connection must not be removed when testing the
winding; refer to the relevant circuit diagram.
Check that the connections (star or delta) comply with the specifications on the rating
plate.
Ensure that the connection values correspond to the information on the rating plate.
Electrical connection
6.3 Preparation
SIMOTICS TN Series N-compact 1PQ8
Operating Instructions 11/2018 71

Table of Contents

Related product manuals