Instruction, use and maintenance manual Pag. 22/39
BMR 20-20H-30 Planetary Mixer
1) Insert a pole of Φ 17.5 [mm]
11.2. Description of the adjustment and commissioning operations
11.2.1. Installation
The machine must be positioned on a smooth surface able to support the weight (floor with resistance
above 20 kgcm
2
) and must be appropriately secured to the floor.
If there is a risk of overturning, anchor the machine to the floor using 4 dowels or bolts with tensile
strength greater than 300 kg (M8).
11.2.2. Electric line connection
The electrical connection must be done by a qualified electrician, according to the methods and
regulations in force in the country of installation.
Make sure that the system voltage and frequency match those on the machine
identification plate, incorrect connection voids the warranty.