EasyManua.ls Logo

Sindoh 3DWOX 7X - Installing from the Top

Sindoh 3DWOX 7X
148 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix
6-6
6
2.2 Installing from the top
Important
-
In the case of the 5X model, follow the “Installing from the front” procedure because installing from the
top is not possible.
-
Referring to the enclosed “Spool stand instructions,” install the spool stand at the top of the machine,
then carry out the following procedure.
1
Open the top door, and remove the tube guiding rod.
2
Pull the snap rings out from the nozzles, then pull the tubes out.
TUBE
TUBE HOLDER
SNAP-RING

Table of Contents

Other manuals for Sindoh 3DWOX 7X

Related product manuals