Determine where on a concrete slab
the grinder will be located. The reel
mounts on top of the grinder. The operator
loads and works from the front. Adequate
working area must be provided around the
reel grinder.
The Peerless requires standard 110
volt, 60 Hz, single phase service. Foreign
versions with 200 volt, 50/60 Hz, single
phase are available. The grinder comes
with an 8 foot grounded cord for 110 volt
service. The grinder also requires 70 psi
clean compressed air.
While unpacking, examine carefully for
any shipping damage. Any damage
should be reported immediately to the
carrier.
By now you have removed the plastic
wrap from the main crate. After removing
the box of accessories and any other
optional equipment, unbolt the grinder
from the pallet and place it in the location
you have selected.