Instruction for work
24
Screws and nuts tightening moment M
A
(if not stated otherwise)
A = size of coil
A
Ø
8.8 10.9 12.9
M
A
(Nm)
M 5 5,9 8,7 10
M 6 10 15 18
M 8 25 36 43
M 10
49 72 84
M 12 85 125 145
M 14 135 200 235
M 16 210 310 365
M 20 425 610 710
M 24 730 1050 1220
M 27 1100 1550 1800
M 30 1450 2100 2450
–
After the first start and few hours of
working check the tightness of nuts
and screws, tighten them if needed.
–
Check up regulary (approx. every 50
hours)!
5.3 Tyres
–
To mount tyres sufficient knowledge
and regulation tools are required.
–
Repair works on tyres are allowed to be
performed by professionals with proper
tools only.
–
Place the machine on flat and solid
ground. Secure it with wedges against
unintentional rolling off.
–
Check the tyre pressure regularly.
Check the tyre pressure regularly and fill it up if
needed, Compare the measured values with the values
given in the table.
Type Tyre
Pressure
(bar)
STAR 720/22 T
STAR 850/26 T
STAR 650/20 T
16 x 6,50 – 8 – 6 Ply 2,0
STAR 720/22 T
STAR 850/26 T
STAR 650/20 T
10,0 x 75 – 15,3 3,0
5.4 Lubrication
In the figure all the lubrication spots are marked. Long
life of the swather is achieved if the time intervals
shown here are met.
–
Repair works, maintenance, periodical
overhauls, cleaning and elimination of
funtctional disturbances must be
performed with the switched off drive
and stand still engine! Remove the
ignition key!