Page10 of 22
Date: 12.08.2020
Step 1
• Place 1.5 mm gasket, on top of Bottom Flange.
• Then place the Ball Valve element on top of the Bottom Flange. The 16 mm nuts and washers should be
mounted, not tightened.
• Place a 1.5 mm gasket on top of the Ball Valve element.
• Mount the intermediate element on top of the Ball Valve element. The track for o-ring to be upwards.
• All 8 nuts and washers should be mounted, not tightened.
Step 2
• Place the plastic alignment tube, all the way, into the sea valve.
• Tighten 8 nuts ball valve to bottom ange.
• Tighten 8 nuts Intermediate element to ball valve.
• Remove the plastic alignment tool.
Step 1
Step 2
Intermediate element
Ball valve
Plastic alignment tube
Bottom ange
Assembly SB-100-SB
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual