12. RE-INSTALLATION
Same procedure as first-time mounting.
1. Tighten the Nut M50, Item (13), Torque : 98 Nm.
2. Push down the Clamp Unit, Item (10) onto the Nut M50.
and tighten the 2 screws M8 (with lock washer).Torque : 40Nm
3. Screw the 2 Nuts M16 sligtly up to the Clamp Unit.
4. Tighten the 2 Nuts M16 (with lock washer) on
1
2
3
4
Mounting order Nut M50 and Clamp Unit :
the opposite side: Torque : 130 Nm
The Clamp Unit must be fitted on Top of Nut M50
to lock the Nut.
(This is done to give extra security.)
Extension TubeCentre Line
Guide Bar Ship
Forward (Ahead)