Page16 of 22
Date: 12.08.2020
Check that the transducer sensor housing, when fully inserted, is ush with the lower surface of the
bottom ange.
Protect sensor!
• When launching ship, lift sensor 50 mm.
• When dry docking ship, lift sensor 50 mm.
10. FINAL ASSEMBLY
• Tighten nut M50
• Push down clamp unit on to the nut M50
• Tighten the 2 screws M8 on the clamp unit
• Tighten the nuts M16
Forward (Ahead)
SKIPPER Electronics AS
SB-100-XX Operation and Installation Manual