01/10/2016
23/26
E_MH_Installation_instruction_Skycom_Skymax_CE
The functions of the control unit and the opening system must be tested by authorized personnel at least once a year.
The control unit informs when the maintenance should be done. The external LEDs on the front panel ashes fast (run-
ning light). The control unit and opening system are of course still full operating. Please call a service technician at your
earliest convenience in order to carry out the maintenance and to test the control and opening system, in order to pre-
pare it for another year of operation. The legal requirements for this must be observed and the testing and control must
as a minimum include the following:
• Control that all opening systems move to full opening when the re function is activated - should not be carried out if
the wind is more than 6 m/sec. as there might be a risk that the opening system cannot close automatically.
• Control of the batteries. If the batteries are replaced it is important to use the correct type.
• Control of in- and outputs on the control.
• Control of re switches and smoke- and heat detectors.
The batteries should be replaced as required, however at least every third year!
Clean dust from components (fan, ...) inside.
Clean wind & rain sensor as required.
Please contact our SHE service for more information or inquiries: Tel: +32 (0)56 24 81 05 - Email: service@agp.be
Maintenance
Date
Maintained
by
System
Check
Battery
Check
Remarks
Year 0
............./............/20........
Year 1
............./............/20........
Year 2
............./............/20........
Year 3
............./............/20........
Year 4
............./............/20........
Year 5
............./............/20........
Year 6
............./............/20........
Year 7
............./............/20........
Year 8
............./............/20........
Year 9
............./............/20........
Year 10
............./............/20........
Year 11
............./............/20........
Year 12
............./............/20........
Year 13
............./............/20........
Year 14
............./............/20........
Year 15
............./............/20........
Year 16
............./............/20........
Year 17
............./............/20........
Year 18
............./............/20........
Year 19
............./............/20........
Year 20
............./............/20........
Year 21
............./............/20........
Year 22
............./............/20........
Year 23
............./............/20........
Year 24
............./............/20........
Year 25
............./............/20........
Year 26
............./............/20........
MAINTENANCE
ENGLISH