01/10/2016
3/26
E_MH_Installation_instruction_Skycom_Skymax_CE
INTRODUCTION
Why do you need to foresee Smoke and Heat Extraction (SHE)?
In case of re, it is not the re itself, but the smoke gasses that make most victims. The heat and smoke gasses ll the
building, which complicates evacuation. Skylux developed different natural SHE systems which create smoke free zones
and bring down temperature during re, which enables a quick and safe evacuation.
SHE systems are legally required in specic buildings. In such buildings, only CE certied systems, in accordance with
European (and Belgian) norms, are allowed to be used.
At the same time, our SHE systems provide free natural daylight and daily ventilation.
Skylux‘ SHE systems:
Each of these SHE systems can be operated by a Skycom
®
CE Master control, possibly in combination with a Skycom
®
CE Slave control.
We developed also a control unit fort he Skymax
®
CE : the Skycom
®
Skymax
®
CE control.
The SHE survey (p. 4) mentions the combinations of control units and smoke hatches allowed and supported by Skylux.
Skyvent
®
CE
Skylux
®
160° CE Skymax
®
CE
Cintramax
®
CE
ENGLISH