SMA Solar Technology AG 6 Electrical Connection
Installation Manual SB13_21TL-IA-en-65 27
6.3.2 Connecting the Inverter to the Electricity Grid
Figure10: Overview of the AC coupling socket
Requirements:
The display language must be set to the required language (see Section7.3 "Changing the
Display Language", page38).
The connection requirements of the network operator must be met.
The mains voltage must be within the permissible range. The exact operating range of the
inverter is specified in the operating parameters (see Technical Description
"Operating Parameters" at www.SMA-Solar.com).
Procedure:
1. Select suitable cable gland for the AC cable
2. Disconnect the miniature circuit-breaker and secure against reconnection.
3. Strip the AC cable by 30 mm.
4. Shorten L and N by 5 mm each.
5. Strip the insulation of L, N, and PE by 4 mm each.
Item Description
A Bush insert
B Threaded sleeve
C Sealing ring PG13.5
D Clamping cage PG13.5
E Pressure screw PG13.5 for cable diameter between 7 mm and 10 mm
F Cable gland M20x1.5 for cable diameter between 10 mm and 14 mm