SMA Solar Technology AG 3 Scope of Delivery
Installation Manual SB13_21TL-IA-en-65 11
3 Scope of Delivery
Check the scope of delivery for completeness and any visible damage. Contact your specialist dealer
if the delivery is incomplete or damaged.
Figure1: Parts included in the scope of delivery
Object Quantity Description
A1 Sunny Boy
B 1 Wall mounting bracket
C 1 Electronic Solar Switch (ESS)*
*optional
D 1/2 Positive DC connector
Sunny Boy 1300TL-10 / 1600TL-10: 1 each
Sunny Boy 2100TL: 2 each
E 1/2 Negative DC connector
Sunny Boy 1300TL-10 / 1600TL-10: 1 each
Sunny Boy 2100TL: 2 each
F 2/4 Sealing plugs
Sunny Boy 1300TL-10 / 1600TL-10: 2 each
Sunny Boy 2100TL: 4 each
G 1 Protective cap for the AC socket on the inverter
H 1 AC coupling socket: bush insert, threaded sleeve, pressure screw PG13.5,
sealing ring PG13.5, clamping cage PG13.5, cable gland M20x1.5
I 1 M6x12 cheese-head screw
K1 Conical spring washer
L1 Jumper
M 1 Cable gland PG16 with two-hole cable support sleeve
N 1 Installation manual, user manual, document set with declarations and
certificates, supplementary sheet with the default settings of the inverter