SMA America, LLC Unpacking and inspection
Installation Guide SB30-40US-IUS103030 15
3 Unpacking and inspection
All Sunny Boy inverters are checked before shipping and packaged in sturdy boxes. However the
sturdy boxes do not guarantee that damage will not occur during shipping and delivery.
It is important to carefully inspect the shipping box and contents prior to installation. If you detect any
external damage after unpacking, report the damage immediately to your SMA dealer and to the
shipping company that delivered the unit. If it becomes necessary to return the Sunny Boy, use the
original packing material.
If you need assistance with a damaged Sunny Boy, contact your SMA dealer or SMA.
Contact information is provided in section „Contact“, page 98.
WARNING
The Sunny Boy weighs up to 88lbs. (40kg). To avoid injury, be sure to use proper lifting
techniques and secure the help of someone to assist in the unpacking and installation of
the inverter.