11 Operating Data and Parameters
SMA Solar Technology AG
User ManualSCCPXT-E7-BA-en-58138
Name Description Value/range Explanation Default
value
PvVtgRisoDif Differential voltage to
PvVtgStrLevMin for
switching from insulation
measurement to feed-in
operation
−250Vto+250V ‒ 0V
IsoDev* Selection of insulation
monitoring device
isoPV3 ‒ isoPV3
isoPV1685 ‒
* To view or change this parameter, you must enter the installer password.
11.2.1.5 Project-Specific Parameters
Name Description Value/range Explanation Default
value
PvPwrMinTr Threshold for starting the
MPP tracker
0 kW to 20 kW ‒ 20 kW
PvPwrMinTrT Timeout for starting the
MPP tracker
1sto1,800s ‒ 600s
PvVtgStr-
LevMin*
Threshold for switching
to feed-in operation
0V to 1,200V SunnyCentral500CPXT 500V
0V to 1,200V SunnyCentral630CPXT 610V
0V to 1,200V SunnyCentral720CPXT 630V
0V to 1,200V SunnyCentral760CPXT 660V
0V to 1,200V SunnyCentral800CPXT 705V
0V to 1,200V SunnyCentral850CPXT 760V
0V to 1,200V SunnyCentral900CPXT 770V
0V to 1,200V SunnyCentral1000CPXT 770V
PVStrT Once the specified time
has elapsed, the inverter
switches from the operat-
ing state "Grid monitor-
ing" to the operating
state "Grid monitoring
time reached".
1sto655s ‒ 90s
VArGra** Gradient of reactive
power change
0%/s to 200%/s ‒ 20%/s
QoDIn-
vCurPv***
Maximum allowed re-
verse current to the PV
array
−1,600 A to 0 A ‒ −60A