EasyManua.ls Logo

Sodi GT4 - Monthly Maintenance Schedule

Sodi GT4
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GT4
45
MAINTENANCE SCHEDULE
This document can not be reproduced or released without the Sodikart authorization.MAN.GT2.EN.01
Keep go-kart in original configuration
Use spare parts of Sodikart origin
DATE :
SURNAME :
SIGNATURE :
7.2 - Monthly maintenance
Inspect each go-kart which will be used all day. The mechanic technician must sign the maintenance sheet after that he
inspects all go-karts.
(the motorization & transmission is on the recto of the sheet and the chassis on the verso).
Motorization & transmission
Controls Go-kart
Check
Replacement
Adjustment
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Engine oil levelr X X
Reduction oil level X X
Spark plug state X X
Power control X X
Tightening of engine mount X X
Air filter state X
Starter pull cord state X X
Tank and hoses waterproofness
X
Belt or chain state X X
Belt or chain tension X X
Belt or chain alignment X X
Sprockets state X X
NOTES
Write the letter representing the check carried out in the box for the go-kart being inspected.
e.g.: Write a "V" in the 'engine mount' box after checking the tightness of the engine mount.
Write "A" in the 'engine mount tightening' box if the tightness of the engine mount has been changed.

Table of Contents

Related product manuals