SOFAR 15~24KTLX-G3 User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd.
Figure 4-3 Clearance for multiple inverters
4.5. Moving of inverter
Unload the inverter from package, horizontally move to the install position. When
open the package, at least two operators insert the hands to the back of heat sink
part.
Figure 4-4 Move inverter from package (1)
Figure 4-5 Move inverter from package (2)