EasyManua.ls Logo

Sofar solar ME3000SP - 3.3 Installation Environment; 3.4 Installation Tools

Sofar solar ME3000SP
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ME3000SP User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
5
Inspect the package and fittings carefully before installation. You should have the following fittings:
Mounting Bracket × 1
AC terminal × 6
M5 screw × 2
Battery terminal × 2
M6 flat washer × 8
Expansion Bolts × 8
Terminal cap × 4
CT terminal × 2
Current Transformer × 2
User Manual × 1
Warranty card × 1
Quality Certificate × 1
Communication cable × 1
Fig. 3 Accessories of ME3000SP
3.3Installation Environment
1) Choose a dry, clean, and tidy place, convenient for installation.
2) Ambient temperature range: -25C ~ 60C.
3) Relative humidity: 0 ~ 100% (non-condensed).
4) ME3000SP shall be installed in a well-ventilated place.
5) No flammable or explosive materials close to ME3000SP.
6) ME3000SP shall be connected to the electrical grid with an overvoltage category III or category II.
7) Maximum altitude: 2000m.
3.4Installation Tools
The following tools shall be prepared before installation:

Related product manuals